Connecting to Sewer

When the Lake Bemidji Wastewater Project's new municipal sewer is ready, eligible property owners will be notified and can connect through a licensed installer. The new system is expected to be operational in late 2027 or early 2028. This page explains the steps, the kinds of costs involved, and where to get help. Figures below are projected or estimated and may change as bids, grants, and final costs are set.

This page is about connecting to the new municipal sewer from the Lake Bemidji Wastewater Project. If you are already served by the Waville Sewer District, see Waville Sewer District. These are separate systems. Waville stays on its own system until Phase 2 of the new project replaces it.

How connecting works

The steps below follow the current Connection Guide. These steps and costs are projected and may change.

  1. Project completion letter. Before construction is finished, the City will mail eligible property owners a letter with next steps.
  2. A sewer stub at your property line. As sewer is built in the roadway, a service stub is placed in the right-of-way at your property line. That is what your property will connect to. The right-of-way generally extends beyond the pavement. Before construction, move plantings, irrigation, fences, or similar items out of the right-of-way. The City is not responsible for damage to private property in the public right-of-way. You can ask for an on-site meeting with the City Administrator or the project engineer before work begins.
  3. Notice of Sewer Connection Hookup. When the new system is active, the City will issue a hookup notice to eligible properties. Property owners then have 5 years from that notice to connect.
  4. Hire a licensed installer. After you receive the hookup notice, hire a licensed sewer installer to do the work on your property and to apply for the needed permits. See Beltrami County's list of licensed septic contractors (PDF) or the Beltrami County Environmental Services septic page. In most cases a licensed installer can handle design and construction. A few properties may also need a licensed professional civil engineer. Your contractor can help you plan the pipe route.
  5. The connection. The installer connects the pipe leaving your building to the stub at the property line. That work involves excavation and new pipe on your property.
  6. Inspection. Contractors should contact the City 48 hours before construction so an inspection can be scheduled. An authorized inspector checks the connection. A tie card documenting the connection is kept in City records, and the property is then ready for sewer billing.
  7. Abandon the old septic system. Parts of a subsurface sewage treatment system (SSTS), cesspool, or similar system that will no longer be used must be abandoned under Minnesota Rule 7080.2500. The owner or the owner's agent must submit a completed record of abandonment to Beltrami County Environmental Services within 15 days of abandonment. For more information, contact Beltrami County Environmental Services at 218-333-4158.
  8. Sewer billing. After you are connected, you will be charged a recurring sewer service fee. See Utility Billing and the cost section below.

Commercial properties, including apartments and condominiums, should contact City Hall for connection details that may differ from a typical home.

What it may cost

Property owners are generally responsible for several kinds of costs. The amounts below are from the October 26, 2026 public hearing presentation. They are projected or estimated and may change as grants, bids, and final construction costs are set.

  • Sewer assessment. An assessment is charged when the system is installed, whether or not you have connected yet. The assessment is based on Equivalent Benefited Frontage (EBF). The projected rate is $165 to $212 per equivalent lineal foot. For an average lot of 85 EBF, the average residential assessment is currently projected at approximately $18,000. The City's goal is to bring that closer to about $14,000, the 2024 estimate, through additional grants (including a Point Source Implementation Grant application) and competitive bids. You may pay the assessment in full when due, or pay it over time through your property tax bill, at an interest rate of 2% above the City's borrowing rate. The payback period is not final yet; it is expected to be 15 or 20 years. These payment terms are projected.
  • Connection fee. There is a projected one-time City connection fee of $2,000. The fee will be waived if you connect within the first year after service is available to your property. Early connection is encouraged so the treatment plant has adequate flow.
  • Installer costs. You hire and pay a licensed installer directly. The City does not set contractor prices. Installers the City has inquired with have quoted typical costs of $3,000 to $7,000, including abandonment (crushing) of the old septic system. Costs can be higher if a pump or dewatering is needed, potentially $10,000 or more. Get at least two written bids. Neighbors sometimes bid together.
  • Monthly service fee. After you connect, a recurring fee covers operation and maintenance of the system. The projected monthly user charge is $65 per Equivalent Residential Unit (ERU). Commercial and other non-single-family properties are billed based on the multiple of a single-family residential user's flow that they generate. See Utility Billing.
  • Optional septic removal. You are responsible for the cost if you choose to remove the old septic system. Removal itself is not required, though unused components must be properly abandoned as described above.

Help with costs

Some programs may help with connection costs or ongoing fees, including for income-qualified residents:

  • USDA Single Family Housing Repair Loans and Grants
  • Minnesota Housing Rehab Loan Program
  • A hardship assessment deferral under Minnesota Statutes, sections 435.193 to 435.195, for qualifying seniors, people with a permanent and total disability, or qualifying military members. This is a deferral, not forgiveness: the assessment remains due later, with interest. Current or delinquent service charges are not eligible. Contact City Hall to ask about applying.

For questions, call City Hall at 218-751-4989 or email the Planning Administrator.